Database design for a scheduling type of application

Thanks for the input and I can certainly live with that for now because as of now you are 100% correct. And in any event, I feel pretty comfortable that if at some future point it does require further evaluation, the way I have the data structured I will have several options without a huge impact to the application code itself.

Again, many thanks for your time. Cheers!